Coal India 2 GW Wind Projects | EoI for EPC Players 2025

Laxman Kumar

Updated on:

Coal India 2 GW Wind Projects thumbnail image

Coal India has invited Expression of Interest from EPC players for 2 GW wind projects. Know project details, scope of work, locations, deadlines and the Ministry’s clean energy targets.

Coal India 2 GW Wind Projects

Coal India Limited (CIL), the world’s largest coal producer, is now taking another big step towards clean energy transition. The company has issued Expression of Interest (EoI) for 2 GW (2,000 MW) wind power projects and is now inviting EPC (Engineering, Procurement & Construction) players. Through this move, Coal India wants to create a strong base for its 9.5 GW renewable energy target by 2030.

Project Capacity aur Targets

Coal India plans to develop wind power capacity from 1,500 MW to 2,000 MW. With this, India’s renewable energy roadmap will accelerate further. According to ministry reports, India’s target is to achieve 500 GW renewable capacity by 2030, and Coal India’s contribution will be crucial in this.

Coal India 2 GW Wind Projects

EoI Deadline and Process

EoI Submission Date: EPC players have to submit their proposals by 16 September 2025.

This EoI is for those players who have expertise in design, engineering and commissioning of wind projects.

Location & Possible States

As per Coal India’s plan, tentative states have been identified for wind projects where both wind resources and transmission network are available:

Andhra Pradesh
Tamil Nadu
Karnataka
Rajasthan
Madhya Pradesh

All these states are part of India’s wind corridor and have been successful in large-scale wind projects in the past.

Scope of Work for EPC Players

EPC companies have to take care of every stage of the project, which includes:

  • Detailed Design & Engineering – Technical planning and site optimization of wind turbines.
  • Micro-Siting – Identifying high wind potential areas.
  • Manufacturing & Supply – Supply of Turbines and associated infrastructure.
  • Erection, Testing & Commissioning – Make the project installed and operational.
  • Performance Guarantees – Ensuring minimum energy output and efficiency.
  • Infrastructure Development – ​​Setup of Transmission lines (33kV), substations and SCADA systems.

Wind Turbine Generator (WTG) Specifications

The specifications of Wind Turbine Generators (WTGs) for this Coal India project have been kept quite flexible. The size of turbines available in the market can range from 1 MW to large capacity machines, so that EPC players can choose the best option as per their technical expertise. Minimum EPC package has been decided as 35%, so that the project implementation is properly distributed and efficiency is maintained. All turbines should be in the list of RLMM (Revised List of Models and Manufacturers), which is mandatory for quality, safety and long-term performance. This ensures that only tested and certified turbines are used in the project.

Land & Lease Requirement

Coal India has clearly defined land and lease policies for its wind projects. The title or lease deed of any land acquired for the project should be directly in the name of Coal India. The lease period will be a minimum of 30 years, which will include all the infrastructure facilities to be built for the project. This long-term lease requirement has been kept so that there is no legal complication in the operation and maintenance of the projects and the investment remains safe. Infrastructure development such as transmission lines, substations and access roads will also be part of this lease agreement.

Implications of the Project

Coal India’s 2 GW wind power project is a significant step that will fast-track the company’s energy transition goals. The first implication is that Coal India will no longer be a coal-dependent company but will emerge as a diversified energy player. The implementation of this project will bring new investments in the wind sector, which will strengthen the renewable energy ecosystem. Also, this initiative will make a direct contribution to India’s clean energy target of 2030. After execution of the project, new employment opportunities will be created, local economy will get a boost and infrastructure and transmission network will also improve in selected states.

Implications & What does it all mean

Transition to Green Energy: This step by Coal India shows that it wants to shift from fossil fuels to renewable energy. 2 GW wind power contribution is valid towards that 9.5 GW target.

Role of State Policies and Transmission Infrastructure: While selecting locations, CIL has seen that there should be existing/committed transmission infrastructure, such as ISTS (Inter-State Transmission System) or state grids, so that it is easy to evacuate power.

Opportunity for EPC Players: This is a good opportunity for the industry. EPC firms have been given comprehensive scope – from design to commissioning. If the firms are experienced, there is a possibility of getting work after bidding.

Long Term Lease & Infrastructure Investment: A 30-year lease deed and prior planning for infrastructure development signifies that Coal India is making a long-term commitment.

Challenges

While this project brings opportunities, it also has some challenges that can act as barriers to smooth execution. The biggest challenge is wind resource variability, as wind speed and climatic conditions are different for each state. Another major issue is transmission bottlenecks, which can delay the project if timely grid evacuation lines and ISTS connectivity are not available. Land acquisition and environmental clearances can also be a time-consuming process. Also, EPC players will have to demonstrate their execution capability and past experience, as performance guarantee and efficiency are top priorities for Coal India. If these challenges are addressed, the success rate of the project can be quite high.

Conclusion

Coal India’s 2 GW wind power project is a landmark initiative that will diversify the company’s energy mix. This move is not just for Coal India, but is also a significant contribution towards India’s clean energy target 2030. If executed successfully, India’s wind energy sector will become more competitive and robust. source

FAQ’s

how many MW wind projects has Coal India issued EoI?

Coal India has issued EoI for 2 GW (2,000 MW) wind projects.

What is the last date for EPC players to submit proposals?

16 September 2025.

In which states will these wind projects be implemented?

Andhra Pradesh, Tamil Nadu, Karnataka, Rajasthan, and Madhya Pradesh.

What is the renewable energy target of Coal India by 2030?

9.5 GW renewable capacity by 2030.

What work scope has been given to EPC players?

Design, engineering, manufacturing, erection, testing, commissioning, and infrastructure development.

Sharing Is Caring: